Restructured Energy Market (REM) ISO Rules

Important Dates & Materials

October 20 | Stakeholder Feedback due

October 9 | Stakeholder Technical Session

October 2 | Stakeholder Questions due

September 10 | Revised Blacklines posted (see update below)

September 4 | Information and Materials


Stakeholder Update | September 10, 2025

There was an issue identified with the Blackline posted on September 4. We have corrected it and a revised version has been posted. While the issue only substantively impacted one REM ISO rule, Section 212.8, Issuing Dispatches and Directives for Operative Reserves, other minor formatting related issues with track changes were found and corrected in the new version. If you had already downloaded a copy of the Blacklines, please replace with the new one. Thank you for your understanding.


Stakeholder Update | September 8, 2025

We are aware of an issue with the Blackline for at least one section of the rules. We are actively investigating and working to correct it. We will repost a new version of the Blackline document as soon as possible. Thank you for your patience and apologies for any inconvenience.


Stakeholder Update | September 4, 2025

On September 4, 2025, the AESO hosted a virtual information session where the final REM design updates were discussed. In addition, the REM ISO rules engagement process, approval process and timeline, a summary of the changes to the ISO rulebook, and the next steps for engagement were reviewed.

To assist in the engagement process, the following documents have been released for stakeholder review:

  • Proposed REM ISO rules
  • Rule Reference Document
  • Table of Concordance
  • Definitions Document
  • Blacklines


Purpose

The AESO has drafted REM ISO rules to align with the finalized REM design. These rules are required to implement the REM.

The AESO is engaging with stakeholders to ensure that the REM ISO rules:

  • align with the finalized REM design, and
  • are technically sufficient (are the rules clear, concise, reasonably self-contained, and consistent with the statutory scheme).

The REM ISO rules engagement is not intended to provide stakeholders with an opportunity to re-visit the finalized REM design.



Engagement Plan and Process

The AESO recognizes that stakeholders require information and context in order to provide meaningful feedback on the REM ISO rules. To support stakeholders, we plan to do the following:

  • On September 4, 2025, from 9:00 a.m. to 12:00 p.m., the AESO will host a virtual kickoff information session to:
    • provide an overview of the scope, timeline and materials for the REM ISO rules engagement process
    • provide a high-level summary of the organization and content of the REM ISO rules, and
    • outline next steps for:
      • approval of the REM ISO rules, and
      • revisions that will be required to the REM ISO rules to address implementation and other requirements.
  • Immediately following the kickoff information session, the AESO will publish the following materials for stakeholder review:
    • drafts of the REM ISO rules
    • drafts of new or revised definitions that accompany the REM ISO rules
    • a rule summary document that:
      • summarizes the content of the REM ISO rule, and
      • identifies outstanding issues to be addressed at a later date, as part of REM implementation
    • where valuable, blacklines of REM ISO rules against existing ISO rules, and
    • a table of concordance that cross-references the existing ISO rules with the draft REM ISO rules.
  • The AESO will provide stakeholders with the opportunity to identify initial areas of concern or confusion with the REM ISO rules via a question board that will close on October 2, 2025.
  • On October 9, 2025, the AESO will host a technical session to discuss question board comments.
  • The AESO will also provide stakeholders with an opportunity to provide in-depth and detailed written feedback on each of the REM ISO rules via a separate survey forum that will be due by October 20, 2025.
  • Between October 20, 2025, and December 2025, the AESO will review stakeholder feedback and consider revisions to the REM ISO rules. Additional engagement with stakeholders may be scheduled during this time if the AESO requires additional information or clarity.
  • In December 2025, we will publish the AESO’s response to stakeholder feedback, as well as revised REM ISO rules. The AESO will also provide blackline comparisons of the REM ISO rules published on September 4, 2025 to the revised versions.

The REM ISO rules will be approved via Ministerial regulation. Before the end of 2025, the AESO intends to submit the revised REM ISO rules (the same rules that will be posted in December 2025) to the Minister of Affordability and Utilities for approval.

Important Dates & Materials

October 20 | Stakeholder Feedback due

October 9 | Stakeholder Technical Session

October 2 | Stakeholder Questions due

September 10 | Revised Blacklines posted (see update below)

September 4 | Information and Materials


Stakeholder Update | September 10, 2025

There was an issue identified with the Blackline posted on September 4. We have corrected it and a revised version has been posted. While the issue only substantively impacted one REM ISO rule, Section 212.8, Issuing Dispatches and Directives for Operative Reserves, other minor formatting related issues with track changes were found and corrected in the new version. If you had already downloaded a copy of the Blacklines, please replace with the new one. Thank you for your understanding.


Stakeholder Update | September 8, 2025

We are aware of an issue with the Blackline for at least one section of the rules. We are actively investigating and working to correct it. We will repost a new version of the Blackline document as soon as possible. Thank you for your patience and apologies for any inconvenience.


Stakeholder Update | September 4, 2025

On September 4, 2025, the AESO hosted a virtual information session where the final REM design updates were discussed. In addition, the REM ISO rules engagement process, approval process and timeline, a summary of the changes to the ISO rulebook, and the next steps for engagement were reviewed.

To assist in the engagement process, the following documents have been released for stakeholder review:

  • Proposed REM ISO rules
  • Rule Reference Document
  • Table of Concordance
  • Definitions Document
  • Blacklines


Purpose

The AESO has drafted REM ISO rules to align with the finalized REM design. These rules are required to implement the REM.

The AESO is engaging with stakeholders to ensure that the REM ISO rules:

  • align with the finalized REM design, and
  • are technically sufficient (are the rules clear, concise, reasonably self-contained, and consistent with the statutory scheme).

The REM ISO rules engagement is not intended to provide stakeholders with an opportunity to re-visit the finalized REM design.



Engagement Plan and Process

The AESO recognizes that stakeholders require information and context in order to provide meaningful feedback on the REM ISO rules. To support stakeholders, we plan to do the following:

  • On September 4, 2025, from 9:00 a.m. to 12:00 p.m., the AESO will host a virtual kickoff information session to:
    • provide an overview of the scope, timeline and materials for the REM ISO rules engagement process
    • provide a high-level summary of the organization and content of the REM ISO rules, and
    • outline next steps for:
      • approval of the REM ISO rules, and
      • revisions that will be required to the REM ISO rules to address implementation and other requirements.
  • Immediately following the kickoff information session, the AESO will publish the following materials for stakeholder review:
    • drafts of the REM ISO rules
    • drafts of new or revised definitions that accompany the REM ISO rules
    • a rule summary document that:
      • summarizes the content of the REM ISO rule, and
      • identifies outstanding issues to be addressed at a later date, as part of REM implementation
    • where valuable, blacklines of REM ISO rules against existing ISO rules, and
    • a table of concordance that cross-references the existing ISO rules with the draft REM ISO rules.
  • The AESO will provide stakeholders with the opportunity to identify initial areas of concern or confusion with the REM ISO rules via a question board that will close on October 2, 2025.
  • On October 9, 2025, the AESO will host a technical session to discuss question board comments.
  • The AESO will also provide stakeholders with an opportunity to provide in-depth and detailed written feedback on each of the REM ISO rules via a separate survey forum that will be due by October 20, 2025.
  • Between October 20, 2025, and December 2025, the AESO will review stakeholder feedback and consider revisions to the REM ISO rules. Additional engagement with stakeholders may be scheduled during this time if the AESO requires additional information or clarity.
  • In December 2025, we will publish the AESO’s response to stakeholder feedback, as well as revised REM ISO rules. The AESO will also provide blackline comparisons of the REM ISO rules published on September 4, 2025 to the revised versions.

The REM ISO rules will be approved via Ministerial regulation. Before the end of 2025, the AESO intends to submit the revised REM ISO rules (the same rules that will be posted in December 2025) to the Minister of Affordability and Utilities for approval.

  • Instructions for Written Feedback

    What we need from Stakeholders:

    • Feedback that is authorized by an organization
    • Solution oriented written feedback on why and how specific REM ISO rule provisions should be changed  

    In Scope:

    • Feedback on whether the REM ISO rules align with the final REM design
    • Feedback on whether the REM ISO rules are technically sufficient:
      • Clear and concise
      • Complete (to the extent possible)
      • Practically implementable
      • Consistent with the statutory scheme, including the Electric Utilities Act (as amended by Bill 52)

    Out of Scope:

    • Revisiting the final REM Design


    While providing written feedback:

    • One response per organization.
    • All submissions will be published on AESO Engage, in its original state.
    • Responses due on or before 4:00 p.m. MDT on October 20, 2025.


    Note: We recommend that responses are prepared in a word document (or some other document processing system) and when ready to submit, the answers are copied and pasted for each question back into the survey response comment box. The formatting (numbering/bullets) may not appear as drafted in the survey comment response; however, the formatting is retained when the responses are exported by the AESO. 

    Submit Feedback
Page last updated: 11 Sep 2025, 07:40 PM