Phase I: Large Load Integration

Key Dates and Materials


Purpose

The AESO will share:

  • The amount (MW) of new large loads that can be reliably served in the immediate term
  • The methodology to assign that load amount to the data centres currently requesting system access
  • Any Connection Process updates required to enable the assignment methodology