Electromagnetic Transient Modelling Requirement Updates

Key Dates and Materials

March 13, 2024 | Implementation of the EMT modelling requirements

Purpose

The AESO is developing new electromagnetic transient (EMT) modelling requirements as part of a series of actions to preserve the secure and reliable operation of the future power system, as outlined in the AESO’s 2023 Reliability Requirements Roadmap(External link).

As part of implementing the EMT modelling requirements, the AESO will be amending its Project Data Update Package (PDUP) and the following Information Documents:

  • ID #2010-001R – Facility Modelling Data and List of Electrical and Physical Parameters for Transmission System Model
  • ID #2017-013R – Model Validation and Reactive Power Report Guidance

The AESO will be consulting with stakeholders and hosting an information session to review the proposed changes and to provide stakeholder feedback.

Key Dates and Materials

March 13, 2024 | Implementation of the EMT modelling requirements

Purpose

The AESO is developing new electromagnetic transient (EMT) modelling requirements as part of a series of actions to preserve the secure and reliable operation of the future power system, as outlined in the AESO’s 2023 Reliability Requirements Roadmap(External link).

As part of implementing the EMT modelling requirements, the AESO will be amending its Project Data Update Package (PDUP) and the following Information Documents:

  • ID #2010-001R – Facility Modelling Data and List of Electrical and Physical Parameters for Transmission System Model
  • ID #2017-013R – Model Validation and Reactive Power Report Guidance

The AESO will be consulting with stakeholders and hosting an information session to review the proposed changes and to provide stakeholder feedback.

  • CLOSED: This survey has concluded.

    The AESO is seeking stakeholder feedback on the proposed changes to AESO’s list of electrical and physical parameters for modelling data and records pursuant to Section 502.15 “Reporting Facility Modelling Data” of the ISO rules. 

    Instructions

    1.  To submit your feedback, you will need to be registered and signed in on the AESO Engage platform.
    2. Please click on the "Complete Stakeholder Feedback" box below to provide your specific comments.
    3. Please submit one completed Stakeholder Feedback survey per organization.
    4. Stakeholder Feedback results will be posted on AESO Engage, in their original state.
    5. Responses due on or before January 9, 2024.

     Stakeholder Questions 

    1. Do you have comments on the AESO’s proposal to add Electromagnetic Transient Models to the ISO’s list of electrical and physical parameters for modelling data and records that must be submitted? See Appendix 1 of Draft ID#2010-001R.  
    2. Do you have any feedback on the draft EMT modelling requirements for generating and FACTS equipment? See Appendix 3 of Draft ID #2010-001R.
    3. Do you have any feedback on the draft EMT model submission checklist provided in Appendix 4 of draft ID #2010-001R?
    4. Do you have any feedback on the draft EMT model verification, validation, and quality testing requirements? See Appendix 5 of Draft ID #2010-001R.
    5. Do you have any feedback on the changes to ID# 2017-013R: Model Validation and Reactive Power Report Guidance?  
    6. Do you have feedback on the AESO’s proposed implementation plan and timelines for the EMT modelling requirements? See slides 26 and 27 of the stakeholder presentation.
    7. Do you have any additional comments?
    8. If you'd like to upload a formatted version of your responses, please do so here.
Page last updated: 15 Mar 2024, 03:07 PM