Rate of Change of Frequency (RoCoF) Stakeholder Survey | Dec. 11, 2024 - Feb. 28, 2025
Purpose
The AESO is conducting a survey on considerations related to the Rate of Change of Frequency (RoCoF) as part of the planned actions outlined in the 2023 Reliability Requirements Roadmap (2023 R3). Our goal is to assess the equipment limitations, protection settings and risks associated with RoCoF during system-wide frequency events. The participation of existing generation facility owners (GFOs) is vital for us to accurately define these risks. We also welcome feedback from project developers, Original Equipment Manufacturers (OEMs), and consultants. The survey is open from December 11, 2024, through February 28, 2025. We thank you in advance for your participation.
Instructions
- Please fill out the organization information section as indicated.
- Only one completed survey will be accepted per organization.
- To upload your completed survey:
- You must be registered and signed in to the AESO Engage platform.
- Click on the "Upload Completed Survey Here" box on AESO Engage to upload your feedback.
- Responses will be treated as confidential and will not be shared with anyone outside of the AESO. However, the overall survey results may be consolidated and shared anonymously in relevant AESO stakeholder sessions and public documents. Specific entities and facilities will not be identified.
- Responses are due by Friday, February 28, 2025.
Materials
Download the RoCoF Stakeholder Survey here. The survey and additional information are also available under AESO Materials.