The 2024 Long-Term Transmission Plan (LTP) has been deferred and will be released in Q1 2025. An update of the LTP will be shared as part of the 2024 Grid Reliability information session scheduled for November 20, 2024. Visit the Grid Reliability Engage page for more details.
Planning the Future of Alberta's Transmission Grid
The 2024 Long-term Transmission Plan (LTP) describes how the AESO plans to develop Alberta’s electricity transmission system over the next 20 years. Alberta’s electricity industry is undergoing the biggest transformation of its 100-plus-year history. The 2024 LTP will provide a vision of the needed transmission infrastructure in Alberta to enable the transformation and maintain a safe, open and reliable electrical system over the next 20 years.
Long-Term Transmission Plan
The LTP is the AESO’s 20-year forward-looking blueprint of how the transmission system needs to be developed to support continued economic growth in Alberta. Updated every two years based on the AESO’s Long-term Outlook (LTO), the LTP provides for a safe and reliable electricity system that enables a fair, efficient and openly competitive electricity market, which is key to the economic well-being and continued prosperity of Alberta.
LTP Objectives
Optimize the use of the transmission system to meet identified transmission needs while minimizing costs
Identify potential near-term transmission facility needs and and provide insight into potential long-term transmission system growth to ensure continued reliability
Present AESO's strategy to manage existing and potential future congestion on the grid
Enable the reliable transition to low and zero-emitting generation technologies
Enable technological advances and efficient energy use, including higher integration of invertor-based resource facilities, electric vehicles, and energy storage facilities
Identify how the transmission system may need to evolve in line with a transforming energy industry
Satisfy the AESO’s mandate according to the Transmission Regulationand Electric Utilities Act to update the transmission system plan every two years
Oct. 25, 2024 | Stakeholder Update
The 2024 Long-Term Transmission Plan (LTP) has been deferred and will be released in Q1 2025. An update of the LTP will be shared as part of the 2024 Grid Reliability information session scheduled for November 20, 2024. Visit the Grid Reliability Engage page for more details.
Planning the Future of Alberta's Transmission Grid
The 2024 Long-term Transmission Plan (LTP) describes how the AESO plans to develop Alberta’s electricity transmission system over the next 20 years. Alberta’s electricity industry is undergoing the biggest transformation of its 100-plus-year history. The 2024 LTP will provide a vision of the needed transmission infrastructure in Alberta to enable the transformation and maintain a safe, open and reliable electrical system over the next 20 years.
Long-Term Transmission Plan
The LTP is the AESO’s 20-year forward-looking blueprint of how the transmission system needs to be developed to support continued economic growth in Alberta. Updated every two years based on the AESO’s Long-term Outlook (LTO), the LTP provides for a safe and reliable electricity system that enables a fair, efficient and openly competitive electricity market, which is key to the economic well-being and continued prosperity of Alberta.
LTP Objectives
Optimize the use of the transmission system to meet identified transmission needs while minimizing costs
Identify potential near-term transmission facility needs and and provide insight into potential long-term transmission system growth to ensure continued reliability
Present AESO's strategy to manage existing and potential future congestion on the grid
Enable the reliable transition to low and zero-emitting generation technologies
Enable technological advances and efficient energy use, including higher integration of invertor-based resource facilities, electric vehicles, and energy storage facilities
Identify how the transmission system may need to evolve in line with a transforming energy industry
Satisfy the AESO’s mandate according to the Transmission Regulationand Electric Utilities Act to update the transmission system plan every two years
2024 Long-Term Transmission Plan Stakeholder Session Deferred
In view of evolving carbon policies and regulations impacting the development of a carbon-neutral, reliable and affordable grid, the AESO is re-evaluating the scenarios in the 2023 Long-Term Outlook. This impacts both the Long-Term Outlook and the Long-Term Transmission Plan. Therefore, the AESO is deferring the 2024 LTP session to a later date when more information on any changes to the scenarios and process can be shared.
Stakeholder engagement, dialogue, and feedback is key to ensure information provided to stakeholders via the LTP continues to be valuable. The AESO is seeking feedback from interested stakeholders on their perspectives around the LTP objectives, content and the value it provides to stakeholders.
Stakeholder Comments
Stakeholder comments have been posted under Stakeholder Submissions.
Page last updated: 25 Oct 2024, 04:31 PM
Signup Banner
to get involved!
Level of Engagement
Consult: Gather input and feedback from stakeholders
2024 Long-Term Transmission Plan has finished this stage
Gather written feedback from stakeholders on objectives, content, and value of the 2024 LTP.
Review & Analysis | March/April 2023
2024 Long-Term Transmission Plan has finished this stage
Review and consider submissions as the AESO develops further analysis.
Report Released | April 26, 2023
2024 Long-Term Transmission Plan has finished this stage
Results of survey published online.
AESO Stakeholder Symposium | June 27, 2023
2024 Long-Term Transmission Plan is currently at this stage
There will be a 2024 Long-term Transmission Plan (LTP) high-level update as part of the inaugural AESO Stakeholder Symposium. To view the agenda and livestream registration, please click here.
2024 LTP Update | Nov. 20, 2024
this is an upcoming stage for 2024 Long-Term Transmission Plan
An update on the 2024 LTP will be shared as part of the 2024 Grid Reliability information session.
Publish 2024 LTP | Deferred
this is an upcoming stage for 2024 Long-Term Transmission Plan
Release the 2024 Long-term Transmission Plan report.
Information Sessions | To Be Determined
this is an upcoming stage for 2024 Long-Term Transmission Plan
Information session to present the insights and results of the 2024 LTP.